We continue to work on our mineral intake, trying to increase the speed of mineral handling. The intake seems to work fine, but we need to refine our catch box so that we can handle either type of mineral. Below is a general idea of where we want to go with this.

We do not want to be limited by only handling either two golds or two silvers at one time. We want to be able to handle one of each simultaneously in order to increase our overall cargo loading efficiency. Below is a plastic mockup of a catch box that we are using to help finalize the design.